Technology thatredesigns the worksite.

With AI and automation, we raise safety and productivity on industrial sites together.

ULSAN HQYEOSU BRANCHDEOKIN R&D CENTER

SK Energy
Korea Expressway Corporation
SK Geo CentricP-T186 VERIFIED
Ministry of Land, Infrastructure and TransportINNOVATION
Korea Occupational Safety and Health AgencyKCS
Korea Technology Finance CorporationKIBO A
Ministry of the Interior and SafetyAWARD
Ministry of Science and ICTAWARD
LIVE1,000daysAccident-free · and still countingSince 2023.01.13 · 1,000 days reached 2025.10.08
Total24typesKCS safety certifications13 ledgers · 11 safety decks
Both2typesSpherical · cylindrical tanks supported
Since2026MOLIT Innovative Product designationCertificate dated 2026.03.20
VERIFIED WITH
SK Geo Centric

P-T186 Ball Tank final verification

SK Energy

Joint technology development MOU

Korea Expressway Corporation

Public-interest evaluation passed

TIPO

13 ledgers · 11 safety decks

01 / 05About us

DI ENGINEERING × DEOKIN

SCROLL TO OPEN THE FIELD

Concept image: scaffolding on a cylindrical tank at a petrochemical complex on a clear day, its upper part continuing as a digital wireframe

FROM FIELD TO INTELLIGENCE

Field technology becomes data,
and data becomes new technology.

ABOUT

DEOKIN has signed a strategic memorandum of understanding (MOU) with DI Engineeringand, on that partnership, runs TIPO as its core business.

TIPO builds trust in the product, DI Engineering delivers it in the field,and DEOKIN researches the next generation of technology with AI and automation.

ONE ECOSYSTEM. SHARED PURPOSE.

Product, field and research: three connected roles.

Close-up of a TIPO safety deck installed on site
01

TIPO

Commercial product · solution

System scaffolding made for the curved surfaces of spherical and cylindrical tanks. Its 13 ledgers and 11 safety decks hold 24 KCS safety certifications.

Machining of TIPO safety decks
02

DI ENGINEERING

Develop · produce · install · operate

Since its founding in 2019, DI Engineering has dealt with safety problems first-hand on structure demolition and scaffolding sites. It develops and manufactures TIPO and installs it in the field.

3D model of system scaffolding around a spherical tank
03

DEOKIN

AI · automation · Physical AI R&D

An R&D organization that studies AI, automation and Physical AI with data accumulated in the field: auto design, structural analysis, smart lifts and safety control.

HISTORY · 2019 — 2026

Years built in the field.

  1. 2019.09

    DI Industrial Development Co., Ltd. founded

  2. 2019.11

    Licensed for structure demolition and scaffolding works

  3. 2021

    ISO 9001 · KOSHA-MS

  4. 2022.02

    Renamed DI Engineering Co., Ltd.

  5. 2022.08

    Patent registered for TIPO product technology

  6. 2023.06

    Head office relocated · factory established

  7. 2024.04

    KCS safety certification obtained

  8. 2025.09

    Minister's Award, Korea Safety Technology Awards

  9. 2026.03

    Designated an Innovative Product by MOLIT

  10. 2026.09

    DEOKIN founded

RECOGNIZED EXCELLENCE

Technology recognized for its value.

CERTIFICATIONS · REGISTRATIONSISO 9001KOSHA-MSKCS safety certification (ledgers · decks)Utility modelDesign registrationTrademark (TIPO)Venture companyCorporate R&D center

CEO MESSAGE

With technology proven in the field, we will make working environments safer.

Watch the CEO interview (Korean) ↗

Greetings. I am Jeong Jae-hoon, CEO.

Technology for industrial sites should be judged by the safety of the people who work there and by the trust of our customers. We began by turning the inconveniences and hazards we met first-hand in the field into concrete designs and products.

Spherical and cylindrical tanks need working space that matches the curvature of the structure. From that need, DI Engineering developed TIPO, a circular system scaffold, and has built experience from design through manufacturing, installation and operation. Our efforts to reduce gaps and overlaps between work decks and to secure stable working routes are reflected in our products and installation methods.

What matters most to us is that design and field match. The technology in a drawing has to be realized in production quality and applied to suit the actual installation conditions. To that end, we check the conditions of each site on the basis of product certification and structural review, and feed the improvements found in use back into design and manufacturing.

DEOKIN aims to extend this experience with AI and automation. We are researching digital twins and auto design based on field data, along with scaffolding material transport and safety control, to reduce the burden on workers while raising safety and productivity together. We will take this research through step-by-step verification and develop it into technology that can be used in the field.

To our customers, we will answer with technology suited to their site conditions and with responsible execution; to our partners, with collaboration they can trust. So that workers can work safely and return to their daily lives unharmed, we will not overlook even the small problems on site.

Thank you to the customers and partners who work with us.

CEOJeong Jae-hoon

OUR VISION

SMARTERTurning sites and data into intelligent technology.
SAFERMaking hazardous work safer.
BETTERTurning research into technology for real industrial sites.
02 / 05Research

RESEARCH & DEVELOPMENT

DIVISION / 01

DESIGN

AI Digital Twin · Auto Design

Read the site, build the geometry, review the layout.

We are researching an auto design flow that starts from site photos and measured dimensions and leads to scaffold layout and clash and reinforcement review.

THE AUTO DESIGN SEQUENCE
01 · INPUT

Enter photos and dimensions.

A photo of the spherical tank is taken and entered together with its width, depth and height.

DEOKIN · AUTO DESIGNSTEP 01 / 04
Site photo of a spherical tank entered into auto designBase model of a spherical tank generated from photos and dimensionsModel with temporary members auto-placed around a spherical tankScreen marking in red where equipment and temporary members clash
DIVISION / 02

STRUCTURE

TIPO Circular System Scaffolding

From geometry design to working space on site.

Curvature-matched design and component analysis are carried through to the assembly and installation of the real product.

TIPO Circular System Scaffolding
01 · GEOMETRY

Fit the curvature of the structure.

Angled ledgers and dedicated decks form a circular layout. The tangent of the decks and the space between deck and tank are reviewed together.

DEOKIN · STRUCTURESTEP 01 / 04
Design drawing of a circular scaffold layout for a spherical tank, improving deck steps and openingsStress distribution of a cylindrical scaffold model in Midas Gen3D model of TIPO system scaffolding assembled around a cylindrical tankTIPO walkway installed along the curved surface of a tank
DIVISION / 03

LIFT

Smart Scaffolding Material Transport

Connecting loading, transport and unloading.

A development concept for a material transport device that combines rack-and-pinion drive with load and environment sensing.

Smart Scaffolding Material Transport
01 · LOADING

Load the material and check it.

Material is loaded on the lower platform and its weight and eccentric load are measured. We are researching a flow that checks the load before transport.

DEOKIN · LIFTSTEP 01 / 04
A worker loading scaffolding material onto the lift platform at the base of a tank scaffoldA loaded platform climbing a rack-and-pinion mastClose-up of the drive unit: motor meshed with the rack, guide rollers, control box and anemometerA worker unloading material from the platform after it reaches the upper work deck
DIVISION / 04

GUARD

Smart Lift Safety Control

Connecting sensing, decision, control and alerts.

Four safety technology concepts for the transport device. Sensors read the load, the environment, the drive condition and the workers, leading to operation limits, stops and maintenance alerts.

Smart Lift Safety Control
01 · LOAD SENSING

Read the load, catch the eccentricity.

Four load cells on the platform measure total weight and compare it with a material specification database to estimate the loaded quantity. We are researching a flow that guides repositioning when an eccentric load is detected.

DEOKIN · GUARDSTEP 01 / 04
Concept drawing of the lifting carriage showing load cells, load path and a 500 kg rated targetDetail drawing of the lift track showing track modules, rack connection and the anti-fall lock pinDetail drawing of the drive unit showing the central rack, drive motor, pinion gear and safety brakeSite photo of workers moving material by hand on a scaffold
03 / 05Business areas

FROM TECHNOLOGY TO INDUSTRY

Technology into the field.Possibility into industry.

TARGET INDUSTRIES

Widening the boundaries of industry.

  • Spherical storage tanks at a petrochemical complex at duskSTORAGE TANKBall tanks · LNG · LPG storage
  • Piping at a refinery on a clear dayPETROCHEMICALRefineries · chemical plants · piping
  • Large plant construction site with cranes and scaffoldingPLANT & EPCIndustrial plants · EPC projects
  • Riverside night view with a truss bridge, a power plant and wind turbinesINFRASTRUCTUREEnergy · power generation · public infrastructure

APPLICATION EXPANSION

Wherever there is a curved surface, TIPO is extending its reach.

  • Concept image of system scaffolding following the fuselage and engine curves of an airliner in a maintenance hangarAVIATIONAircraft maintenance · aerospace facilities
  • System scaffolding with stair towers wrapped around a curved hull in a dockSHIPBUILDINGCurved hulls · LNG carrier cargo tanks
  • Concept image of system scaffolding along a curved building façadeARCHITECTURECurved façades · domes · long-span structures

IN ACTION

Proven in the field.

01 / 04
TIPO walkway installed at the top of the P-T185 ball tank
Robotic welding in the TIPO production process
Joint technology development agreement between SK Energy and DI Engineering
MOLIT Innovative Product certificate (valid 2026.03.20 — 2029.03.19)

SK Geo Centric P-T185 Ball Tank

TIPO system scaffolding installed on a ball tank · 2024.05.13 — 05.31

WHAT'S NEXT

From field verification to industry expansion.

  1. STEP 01 · NOW

    Field verification

    Application and demonstration at refineries and petrochemical plants

  2. STEP 02

    Product expansion

    More supported structures and a wider component lineup

  3. STEP 03

    Technology advancement

    Lifting automation · integrated safety sensors

  4. STEP 04

    Industry expansion

    Plants · power generation · industrial infrastructure under review

04 / 05TIPO system scaffolding

CURVED-SURFACE SYSTEM SCAFFOLDING

TIPO SYSTEM SCAFFOLDING

It starts on the drawing
and is completed in the field.

The scaffold around a curved tank is drawn line by line, then gives way to a photo of the real installation.

Actual TIPO system scaffolding installed on a circular tank

TIPO SYSTEM SCAFFOLDING

Fit the curve.Raise the safety.

Angled ledgers and dedicated safety decks. TIPO system scaffolding, made for spherical and cylindrical tanks.

Total24types13 ledgers · 11 safety decks · KCS safety certified
The actual product: TIPO ledgers and safety decks assembled on standard system-scaffold uprights
TIPO—01 / MODULAR ASSEMBLY

SHAPED FOR YOUR STRUCTURE

An answer shaped to your structure.

FROM SINGLE PART TO SYSTEM

From a single part to a single system.

ENGINEERED. ANALYZED. VERIFIED.

The case for safety, stated in numbers.

Whole structure · stress ratio · displacement

Midas Gen · results for a specific model in the technical brochure

Safety deck FEM analysis

Inventor Nastran · component analysis from the TIPO leaflet

01 / STRESS RATIOWithin limit
Under 1.00.77/ 1.0
0.00Allowable limit 1.00
02 / DISPLACEMENTWithin limit
Within 1/1501/158< 1/150
0Allowable limit 1/150

LOAD CONDITIONS / KDS 21 10 10 · For the analysis model in the technical brochure · Each site needs its own review

VALUE ENGINEERING

Beyond safety, to Higher value.

Function-oriented VE analysis · measured against the comparison option, with performance and value assessed after the added cost

Up37.55%PERFORMANCE GAIN
Up16.57%VALUE GAIN
FIELD RECORD

2023.01.13 — 2025.10.081,000-day accident-free target reached

  • TIPO system scaffolding on a spherical tank, field case 1
  • TIPO system scaffolding on a spherical tank, field case 2
  • TIPO system scaffolding on a spherical tank, field case 3

IMPROVEMENT · BEFORE AND AFTER

OVERLAP

Tripping

BEFORE

Overlapped decks → obstructed walking · loss of balance

AFTER

One-piece work decks remove the overlap

Tripping, after: One-piece work decks remove the overlap
Tripping, before: Overlapped decks → obstructed walking · loss of balance
BEFOREAFTER

Drag the ↔ on the image or move the slider to compare before and after

ADVANCED GUARDRAIL SYSTEM

Advance guardrail systemSafety goes up first. Then the work begins.

With the advance guardrail system, the guardrail is installed before a worker steps onto the upper work deck, keeping the risk of a fall during work at height to a minimum.

  1. A worker lifting a work deck from below onto an upper level with no guardrail
    01/ 03

    Install the upper work deck

    The work deck is lifted from below onto an upper level that has no guardrail.

  2. A worker climbing a ladder to an upper work deck with no guardrail
    02/ 03

    Move up

    The worker climbs onto the upper work deck, which has no guardrail.

  3. A worker installing a guardrail at the edge of an unguarded upper deck without a harness attached
    03/ 03

    Install the guardrail

    The guardrail is installed while exposed at the open edge. Without a safety harness attached, there is a risk of falling.

FROM GROUND TO COMPLETION

A system completed in the field.

Watch the installation video ↗
P-T185 installation record: Base assembly
01Base assembly
P-T185 installation record: Mid-section
02Mid-section
P-T185 installation record: Upper section
03Upper section
P-T185 installation record: Completed view
04Completed view

HOW WE BUILD

Safety on curved-surface sites, built the Engineered way.

TIPO safety deck components being machined on the in-house line
24typesKCS safety certified · 13 ledgers · 11 safety decks · made in-house
01

Site survey and 3D modeling

We check the tank geometry and the surrounding equipment, and review the component layout in a 3D model.

02

Curvature-matched component design

13 angled ledgers and 11 safety decks close the gaps along the curve.

03

In-house production and KCS certification

Components made on our robotic welding line hold 24 KCS safety certifications.

04

Installation and safety management

As on the P-T185 Ball Tank installation (2024.05.13 — 05.31), we manage the schedule and zero accidents together.

LET'S BUILD TOGETHER

Let's build the next site together.

Send us your inquiry about adopting the product or technical cooperation.

05 / 05Contact us

GET IN TOUCH

What shall we build together?

Send us your product, technical cooperation or quotation inquiry.

Phone: +82-52-287-7727 · Email: di1551@naver.com